Project overview
Scope of works
- Façade retention temporary works
- Part demo & strip out
- Piling installation
- Basement Formation
- Installation of new superstructure steel frame & floors
Client:
Private
Architect:
KSR Architects
Structural Engineer:
Heyne Tillett Steel
Duration:
44 weeks
Size:
Overall – 920 sq/m
Basement – 230 sq/m
Project Type:
Structure, Basement
Share:
One of London’s most sought-after tree-lined streets
Knowles are proud to be acting as Principal Contractor on phase 1 works at a prestigious project on Hamilton Terrace, St Johns Wood. The project involves the complete remodel and extension of the existing the residence which includes the formation of a new 2500 sq/ft basement.
With phase 1 due to complete in Q4 2023, Knowles’ scope of works will include façade retention, excavation of the new basement level and formation of the new internal superstructure.
Located in St John’s Wood, North London, Hamilton Terrace is a highly sought-after, tree-lined residential street, home to a number of notable residents. With its village like ambience, elegant regency buildings, world famous cricket ground and established cosmopolitan atmosphere, St John’s Wood is one of prime London’s most desirable addresses.
The team for the project includes: Regency Grove (Contract Administrator), KSR (Architects), HTS (Structural Engineers), Integration (M&E)